What it costs

Published planning ranges for every scope on this site, with the basis stated and the soft costs that are not in a builder’s number listed separately — because leaving those out is how a budget ends up wrong by a quarter.

Reviewed October 2026 · planning ranges, not a bid

A square-foot price is useful for deciding whether to start and dangerous for deciding what to sign. It is worth spending two minutes on why.

The cost of a house is not evenly distributed across its floor area. A kitchen costs several times what a bedroom costs per square foot. A bathroom is worse. Foundations, structure and utilities do not scale with floor area at all — a 300 square foot addition needs nearly as much foundation work per foot of wall as a 900 square foot one. So a small addition containing a kitchen will come in far above the rate, and a large simple one will come in below it.

Use these numbers to answer “is this project a $400,000 project or a $1.2m one”, which is the question you need answered before you spend money on drawings. Do not use them to build a budget you intend to hold somebody to.

And read the soft-cost table below before you do either. Construction is between roughly two-thirds and four-fifths of what you will actually spend. The rest is design, engineering, reports, city fees and the cost of owning a building you cannot live in for two years — and that last one is the line most often missing entirely.

The number that is not in any estimate

Carrying cost. On a 30-month new build, the loan interest, property tax, insurance and rent somewhere else are routinely a six-figure sum, and no contractor’s estimate contains it because it is not construction. It is the single strongest argument for publishing the schedule as prominently as the price.

What moves a number to the top

  1. What is already there. An 1890s building with an unreinforced foundation needs work before your project can start.
  2. Access. A narrow attached lot with no side yard means everything is carried by hand, through the house.
  3. Specification. The gap between a good kitchen and a bespoke one is a multiple, not a percentage.
  4. Occupancy. Working around people who live there costs real money in staging and lost productivity.

Give us all four and a range collapses to something you can plan on, usually on the first call.

Working on a number this week?

Tell us the building, the year and the square footage and we will narrow it on the call.

Call (415) 543-2100

Mon–Fri 8:00 AM–5:00 PM PT

P 2.0 By scope

Construction cost, by scope

Construction only. Design, engineering, reports, city fees and tax are separate and are in the next table.

01 Additions & Vertical Expansion

Addition work · planning price ranges
Item Description Unit Range
A.10 Rear addition, finishedStructure, envelope, finishes, ordinary fixtures SF $650–$1,050
A.20 Vertical addition, finishedIncluding structural work to the storeys below SF $750–$1,250
A.30 Ground-floor build-outConverting garage or storage to living space SF $480–$850
A.40 Deck and rear stairStructure, decking, rail, to code SF $180–$340
A.50 Foundation work under an additionNew footings, tie to existing LF $900–$2,200
A.60 Kitchen, mid to high specificationCabinetry, appliances, finishes, excluding appliances over allowance EA $85,000–$260,000
A.70 Bathroom, fullIncluding waterproofing and any structural notching EA $42,000–$110,000
A.80 Window replacement, code-compliantIncluding any structural header work EA $2,600–$8,500

Additions & Vertical Expansion in detail — with its schedule and what has to be established before anybody can price it.

02 Accessory Dwelling Units

Accessory dwelling unit work · planning price ranges
Item Description Unit Range
B.10 Ground-floor ADU, finishedFull conversion including kitchen and bath SF $520–$900
B.20 Garage conversion ADU, finishedIncluding replacing the garage door opening SF $560–$950
B.30 Detached rear-yard ADUNew structure on its own foundation SF $700–$1,150
B.40 Underpinning to gain ceiling heightSequential underpinning and slab, per linear foot of wall LF $1,400–$3,200
B.50 Separate utility serviceElectrical, water and gas, separately metered LS $28,000–$95,000
B.60 Sewer lateral replacementFrequently required, frequently discovered late LF $320–$780
B.70 Fire and sound separationAssemblies between the unit and the rest of the building SF $38–$95

Accessory Dwelling Units in detail — with its schedule and what has to be established before anybody can price it.

03 Seismic & Structural

Seismic and structural work · planning price ranges
Item Description Unit Range
C.10 Soft-storey retrofit, small buildingTwo to four units, engineered frames and walls LS $95,000–$260,000
C.20 Soft-storey retrofit, larger buildingFive or more units LS $220,000–$680,000
C.30 Steel moment frame, installedFabricated, set, welded, inspected EA $38,000–$110,000
C.40 Plywood shear wall with holdownsIncluding opening up, nailing schedule, inspection LF $420–$980
C.50 Foundation replacementSequential removal and replacement under an occupied building LF $1,100–$2,800
C.60 Underpinning, sequentialTo gain height or to support new load LF $1,400–$3,200
C.70 Cripple wall bracing and boltingWhere a crawl space exists LF $180–$420
C.80 Special inspectionIndependent, required on most of the above LS $6,500–$32,000

Seismic & Structural in detail — with its schedule and what has to be established before anybody can price it.

04 Multifamily Renovation

Multifamily renovation · planning price ranges
Item Description Unit Range
D.10 Unit renovation, occupied buildingKitchen, bath, finishes, staged around tenants SF $420–$780
D.20 Unit renovation, vacant unitThe same scope, without the staging premium SF $330–$600
D.30 Plumbing riser replacementWhole stack, per storey, with unit reinstatement EA $18,000–$52,000
D.40 Electrical service upgradeService, panel, unit sub-panels LS $45,000–$160,000
D.50 Common area and entryStair, lobby, corridors, lighting, accessibility LS $60,000–$240,000
D.60 Roof replacementTear-off, deck repair, membrane, flashing SQ $1,400–$3,200
D.70 Exterior envelope and windowsSiding, waterproofing, windows, per unit EA $28,000–$95,000
D.80 Tenant protection and stagingDust walls, protection, temporary provisions, per unit EA $4,500–$18,000

Multifamily Renovation in detail — with its schedule and what has to be established before anybody can price it.

05 New Residential Construction

New residential construction · planning price ranges
Item Description Unit Range
E.10 New house, standard specificationStructure, envelope, systems, ordinary finishes SF $800–$1,150
E.20 New house, high specificationBespoke millwork, specified fixtures, complex envelope SF $1,150–$1,900
E.30 Detached guest houseOwn foundation, own services SF $700–$1,200
E.40 Excavation and shoring, attached lotNext to an existing foundation, engineered CY $180–$620
E.50 Foundation, engineered for slope or soilsPiers, grade beams or mat, per geotechnical report LS $140,000–$620,000
E.60 Facade retention and shoringTemporary structure holding a retained wall LS $85,000–$380,000
E.70 Demolition, attached buildingSelective, with protection to both neighbours LS $45,000–$180,000
E.80 Site utilities and connectionsSewer, water, gas, electrical to the street LS $38,000–$160,000

New Residential Construction in detail — with its schedule and what has to be established before anybody can price it.

Units are SF square foot of the area being built or renovated, LF linear foot, CY cubic yard, SQ roofing square (100 SF), EA each, LS lump sum.

Prices are USD planning ranges for San Francisco residential work, exclude design and engineering fees, city permit and impact fees, geotechnical and hazardous-materials assessment, furnishings and any applicable tax, and assume normal access and no undisclosed conditions. Durations are planning ranges that assume no discretionary review and one round of plan-check corrections. They are published so an owner can plan before spending money on drawings. They are planning ranges, not a bid. Reviewed October 2026. A price and a schedule for your project come from a written proposal against a defined scope. See the disclaimer.

P 3.0 Not construction

The other quarter of your budget

None of this is in a builder’s number, and it is where most budgets go wrong. It is published here because you will pay it whether or not anybody told you about it.

Soft costs · what sits on top of the construction number
Item Typical range Note
Architect and designer 8–15% of construction Schematic through construction administration. A complex project or a small one costs proportionally more.
Structural engineer $8,000–$60,000 Required on anything structural. On a retrofit it is a substantial and unavoidable line.
Geotechnical report $6,000–$22,000 Required on most new construction and on many foundation projects. The cheapest large piece of information available to you.
City permit and impact fees $8,000–$180,000+ Wildly variable. Depends on valuation, whether you are adding a unit, and which fees apply.
Hazardous materials survey $1,500–$6,000 Asbestos and lead on any pre-1980 building. Abatement is separate and is its own number.
Survey $3,500–$14,000 Boundary and topographic. On an attached lot in this city it is worth doing properly.
Title 24 energy compliance $1,800–$9,000 Required. Increasingly consequential for what systems you are allowed to install.
Expediting and filing $3,000–$25,000 Optional, and frequently worth it on a complex entitlement.
Carrying cost while you wait Your own number Loan interest, tax, insurance and rent somewhere else, for the whole schedule. On a 30-month project this is routinely the largest omitted line in a feasibility calculation.

As a planning rule, add 20 to 35 per cent on top of the construction number for soft costs, and more on a project with heavy city fees or a difficult site. Then add your own carrying cost for the full length of the schedule, which on a long project can exceed every other line in this table put together.

P 4.0 Worked through

A 600 square foot rear addition, all in

Built from the tables above, with nothing added and nothing hidden. This is the arithmetic we would rather you could do before the first meeting than after the bids come in.

600 SF two-storey rear addition, mid specification · order of magnitude
Line Basis Lower Higher
Addition shell and finishes 600 SF at $650–$1,050 $390,000 $630,000
Kitchen within it One, mid specification $85,000 $150,000
Bathroom One, full $42,000 $78,000
Foundation under the addition 34 LF at $900–$2,200 $30,600 $74,800
Deck and rear stair 120 SF at $180–$340 $21,600 $40,800
Construction subtotal The builder’s number $569,200 $973,600
Soft costs At 20% and 35% $113,800 $340,800
Carrying cost, 18 months Your own number, not ours not included not included
Order of magnitude Before carrying cost $683,000 $1,314,400

A spread of nearly two to one on the same 600 square feet. Neither column is padded and neither is a bid — both are arithmetic done on the published tables. The way you find out which end you are at is to let somebody look at the building, which costs nothing.

Additions in detail How the money works

P 5.0 Questions

Questions about the money

Deposits, progress payments, allowances, change orders and your statutory right to cancel are in the payment and cancellation policy.

Why are the ranges so wide?

Because the honest spread is wide, and narrowing it on a web page would make it less true rather than more useful. A rear addition at $650 a square foot and the same addition at $1,050 differ in specification, in what is behind the walls, in access, and in how much structural work the existing building needs to carry it. Give us the building and the drawings and the range collapses quickly — but it collapses on your building, not on a page.

What actually moves a number to the top of its range?

Four things, roughly in order. What is already there, because an 1890s building with an unreinforced foundation needs work before your project can start. Access, because a narrow attached lot with no side yard means everything is carried by hand. Specification, because the difference between a good kitchen and a bespoke one is a large multiple. And occupancy, because working around people costs real money in staging and lost productivity.

Is a square-foot price meaningful at all?

It is useful for sizing and dangerous for budgeting, and it is worth understanding why. A square-foot rate is an average across a whole scope, and the cost is not evenly distributed: kitchens and bathrooms are several times the rate of a bedroom, and foundations and structure do not scale with floor area at all. A 300 square foot addition containing a kitchen will not cost what the rate suggests. Use it to decide whether to start, not to decide what to sign.

What is not in these numbers?

Everything that is not construction. Design and engineering fees, the geotechnical report, city permit and impact fees, hazardous materials survey and abatement, survey, energy compliance, furnishings, and tax. Together those routinely add 20 to 35 per cent on top of the construction number, and on a project with a big fee exposure more. There is a table of them further down this page, because leaving them out is the most common way a budget is wrong by a quarter before anybody has done anything wrong.

What is an allowance, and why does my estimate have them?

An allowance is a line with a stated sum for something that cannot be priced yet — tile you have not chosen, or framing behind a wall nobody has opened. It is reconciled against actual cost when it is known, up or down. An estimate for work on a hundred-year-old building that contains no allowances is not a more confident estimate, it is a less honest one, and the difference will show up as change orders. Ask every contractor how many allowances are in their number and what each one is based on.

Fixed price or cost-plus?

Both are legitimate and they allocate risk differently. A fixed price gives you certainty and the contractor prices the uncertainty into the number, which on an old building means a contingency you pay whether or not it is needed. Cost-plus with a guaranteed maximum gives you the benefit if the unknowns turn out well, and requires you to be comfortable with open books and more involvement. On a well-documented new build we would usually suggest fixed. On a gut renovation of an 1890s building, cost-plus with a cap is frequently the more honest structure.

How firm is the number in a proposal?

The scope is firm, the allowances are identified as allowances with their basis stated, and the contract says exactly what happens when an allowance is exceeded or a condition differs. What is not firm is anything that depends on a decision you have not made or a wall nobody has opened. The point of writing it that way is that there is nothing to argue about later, because it was already written down.

Why publish prices at all?

Because the alternative is an owner who has no idea whether their project is a $300,000 project or a $1.2m one until they have spent money on drawings to find out. That is a bad position to put somebody in, and it is the normal one in this industry. Publishing ranges with a stated basis costs us nothing we were not going to tell you in the first meeting, and it means the people who call are the people whose project is real.

Narrow the range on a phone call

The building, roughly when it was built, the square footage you have in mind, and whether anybody is living in it. With those four we can usually tell you which end of each range you are at, and what about your project would push it past the top.